The PDCA cycle of the previous level is the basis of the PDCA cycle of the next level, and the PDCA cycle of the next level is the implementation and specification of the upper level cycle. 3 Production balance management (five balances) Cotton spinning production is a specific flow production method
, which requires multi-process flow production control. At present, due to the development of spinning technology, most enterprises are equipped with new spinning equipment, coupled with the integration of modern management concepts, how will the scale effect and benefits of the large workshop be produced? This problem requires us to continue to explore.2 Contents in charge of the workshop 1.
Methodology refers to the synthesis of research methods used in technical and economic analysis. If there are only three stages, and failure experience is not incorporated into relevant standards, systems, and regulations, achievements cannot be consolidated, lessons learned, and similar problems cannot be prevented from recurring.’The basic thinking method of system theory is to treat all the objects of research and processing as a system, analyze the structure and function of the system, study the interrelationship and change regularity of the system, elements,
and environment, Magnolia Polyester Yarn the problem from the point of view of optimization system.he development of my country’s cotton spinning industry is a microcosm of my country’s industrialization. 2. This is a good summary stage. (3) The key to promoting the PDCA cycle is the summary stage, which is the key to the PDCA cycle’s ascent and advancement. The management matters issued by the superior supervisor are a kind of management instruction and a management task that requires the workshop to complete. (8) Responsibility for equipment maintenance.
https://www.dkyarn.com/product/colorful-yarn/300d-magnolia.html
, which requires multi-process flow production control. At present, due to the development of spinning technology, most enterprises are equipped with new spinning equipment, coupled with the integration of modern management concepts, how will the scale effect and benefits of the large workshop be produced? This problem requires us to continue to explore.2 Contents in charge of the workshop 1.
Methodology refers to the synthesis of research methods used in technical and economic analysis. If there are only three stages, and failure experience is not incorporated into relevant standards, systems, and regulations, achievements cannot be consolidated, lessons learned, and similar problems cannot be prevented from recurring.’The basic thinking method of system theory is to treat all the objects of research and processing as a system, analyze the structure and function of the system, study the interrelationship and change regularity of the system, elements,
and environment, Magnolia Polyester Yarn the problem from the point of view of optimization system.he development of my country’s cotton spinning industry is a microcosm of my country’s industrialization. 2. This is a good summary stage. (3) The key to promoting the PDCA cycle is the summary stage, which is the key to the PDCA cycle’s ascent and advancement. The management matters issued by the superior supervisor are a kind of management instruction and a management task that requires the workshop to complete. (8) Responsibility for equipment maintenance.
https://www.dkyarn.com/product/colorful-yarn/300d-magnolia.html
USTE; HVI 1000 (1 set), dty 600D/192F PRO2 (2 sets) and other related instruments. Winding: Murata No. The quality performance data consists of production online data + offline test data of laboratory personnel + process inspection data + inspection data of central laboratory personnel.1 Spinning plant scale Spinning monomer workshop 100,000 spindles, all produced combed compact spinning 50S-140S. The root cause of abnormal problems in the benchmark must be tracked and implemented. To establish a benchmarking management system, first of all, during employee induction training, we must focus on explaining the employee’s salary composition method: Operation (piece counting)-basic salary + output performance + quality performance + other categories; equipment (time)-basic salary + quality Performance + other categories.
Accounts are sent to the branch office, information technology center, and company leader OA mailbox every day. However, there is no focus on training for employees’ quality awareness. The main instruments configured by the branch are: Changling CT200 dry uniformity tester; Changling YG063T automatic single yarn strength tester; YG1 72/1 72A hairiness tester; YG135T thick dry dryness uniformity tester.
The data standards in the table refer to the requirements in the case of 100% PIMA, 100% SJV or 100% new fine cotton. 21C winder 24 sets (60 spindles) 1. Spinning: 110 sets of warp and weft spinning machines EJM128A (456 spindles); 40 sets of warp and weft spinning machines F1520 (1200 spindles). The employee’s salary management must be included in the quality performance data, and the relevant quality benchmarking management system must be trained when the employee enters the job, and the combination method and importance of the employee’s output and quality salary should be clearly informed.2
The laboratory is equipped with 12 staff in three shifts, 4 in each shift (2 front and back spinning); 2 Changbai shifts (1 laboratory supervisor, One gear room administrator); one craft supervisor. Under normal circumstances, the company arranges to learn the company’s various regulatory management systems, including: production management system, safety management system, payroll attendance management system, and so on.
https://www.dkyarn.com/product/conventional-product-line/600d192f-optical-white-s-z-him-draw-texturing-yarn.html
Accounts are sent to the branch office, information technology center, and company leader OA mailbox every day. However, there is no focus on training for employees’ quality awareness. The main instruments configured by the branch are: Changling CT200 dry uniformity tester; Changling YG063T automatic single yarn strength tester; YG1 72/1 72A hairiness tester; YG135T thick dry dryness uniformity tester.
The data standards in the table refer to the requirements in the case of 100% PIMA, 100% SJV or 100% new fine cotton. 21C winder 24 sets (60 spindles) 1. Spinning: 110 sets of warp and weft spinning machines EJM128A (456 spindles); 40 sets of warp and weft spinning machines F1520 (1200 spindles). The employee’s salary management must be included in the quality performance data, and the relevant quality benchmarking management system must be trained when the employee enters the job, and the combination method and importance of the employee’s output and quality salary should be clearly informed.2
The laboratory is equipped with 12 staff in three shifts, 4 in each shift (2 front and back spinning); 2 Changbai shifts (1 laboratory supervisor, One gear room administrator); one craft supervisor. Under normal circumstances, the company arranges to learn the company’s various regulatory management systems, including: production management system, safety management system, payroll attendance management system, and so on.
https://www.dkyarn.com/product/conventional-product-line/600d192f-optical-white-s-z-him-draw-texturing-yarn.html
Each doffing and each tour is a work unit
2020年8月17日 日常According to the use of roving and the specified time for each tour, reasonably control the number of rovings to be changed during the tour to ensure the neatness of the sections. Use the above five to see four and make no mistakes.
The other ends are consciously not connected, wait Reconnect the next tour (when the end breaks are not too many, it is not advisable to consciously leak), in order to master the uniform tour time, when there is an empty roving and a break at the same time, it should be connected first, and then the roving is replaced. lilac Polyester Yarn (3) Touring method: use your eyes regularly and flexibly during the tour, do five looks, take full care of the two-faced broken head, and pay attention to the condition of sliver and roving. There is no leakage from left to right when wiping the board.
② Work is planned and prioritized: Strengthen work foresight, planning, and flexibility, master the timing rules of large, medium, and small yarn end breaks and roving changes, and arrange all tasks for each doffing and each tour . When several adjacent rovings need to be replaced at the same time, they should be left to right first.
When life is difficult to do, adopt the method of picking and putting, pulling through (for roving), lifting and putting (for cradle), trying to connect more and less, the two ends of the flute tube are basically not put, flexible handling Decapitation to prevent a vicious circle. According to the different number of stands, different patrol circuits are used. ② Look at the middle section of the car: look at the broken head first, then the roving, first right then left, no leakage, no leakage.
The roving pagoda is divided into sections: there are the same platform in the same direction, the same platform in the opposite direction, single head type, gap type, etc. Busy phenomenon. D. (b) According to the speed of his basic operation speed, foresee the workload of each tour, more joints change roving, less cleaning work, otherwise, more cleaning work. Three thorough: do the cleaning work thoroughly to lay a good foundation for the successor., and reasonably master the touring Time, arrange all work in a planned way. B. Each doffing and each tour is a work unit, and we must master the law of end-breaking and distinguish the priorities. The basic spirit and basic characteristics of the working method (1)
https://www.dkyarn.com/product/colorful-yarn/300d-lilac.html
The other ends are consciously not connected, wait Reconnect the next tour (when the end breaks are not too many, it is not advisable to consciously leak), in order to master the uniform tour time, when there is an empty roving and a break at the same time, it should be connected first, and then the roving is replaced. lilac Polyester Yarn (3) Touring method: use your eyes regularly and flexibly during the tour, do five looks, take full care of the two-faced broken head, and pay attention to the condition of sliver and roving. There is no leakage from left to right when wiping the board.
② Work is planned and prioritized: Strengthen work foresight, planning, and flexibility, master the timing rules of large, medium, and small yarn end breaks and roving changes, and arrange all tasks for each doffing and each tour . When several adjacent rovings need to be replaced at the same time, they should be left to right first.
When life is difficult to do, adopt the method of picking and putting, pulling through (for roving), lifting and putting (for cradle), trying to connect more and less, the two ends of the flute tube are basically not put, flexible handling Decapitation to prevent a vicious circle. According to the different number of stands, different patrol circuits are used. ② Look at the middle section of the car: look at the broken head first, then the roving, first right then left, no leakage, no leakage.
The roving pagoda is divided into sections: there are the same platform in the same direction, the same platform in the opposite direction, single head type, gap type, etc. Busy phenomenon. D. (b) According to the speed of his basic operation speed, foresee the workload of each tour, more joints change roving, less cleaning work, otherwise, more cleaning work. Three thorough: do the cleaning work thoroughly to lay a good foundation for the successor., and reasonably master the touring Time, arrange all work in a planned way. B. Each doffing and each tour is a work unit, and we must master the law of end-breaking and distinguish the priorities. The basic spirit and basic characteristics of the working method (1)
https://www.dkyarn.com/product/colorful-yarn/300d-lilac.html